Industrial Parks

Burshtyn

Burshtyn

Exclusive Strategic Partners

Specialization and key industries:

  • Processing and preserving of fruits and vegetables
  • Manufacture of other food products
  • Textile production, finishing, and manufacturing of knitted and crocheted goods
  • Wood processing, wood and cork products
  • Mechanical engineering (general-purpose equipment)
  • Manufacture of non-metallic mineral products (construction materials)
  • Supporting sectors: scientific and technical activities, ICT, combined logistics
  • The total area of the Industrial Park:

    20.4535 ha
  • Form of ownership:

    Municipal
  • Status:

    Registered
  • Date of registration:

  • Construction principle:

    Greenfield
  • Availability of newly built facilities:

    More than 99,000 m² of production and auxiliary premises are planned for construction

Location today

Infrastructure:


  • Paved roads for motor transport:

    H09 “Mukachevo–Ivano-Frankivsk–Rohatyn–Lviv” – frontage of the site, reconstructed, ~25 m wide.
  • Highway:

    Kyiv – 550 km
    Lviv – 91 km
    Ivano-Frankivsk – 44 km
    Romania – 180 km
    Poland – 200 km
    Slovakia – 300 km
    Hungary – 320 km
  • Railway roads:

    Burshtyn railway station – 4 km
  • Sea port:

  • Air connection:

Participants, conditions and incentives:

Number of participants and other subjects – absent

Conditions for participants:

  • Activities in manufacturing, innovation, scientific and technical fields

  • Sublease from the managing company, construction on own plots

  • Priority – jobs for residents of Burshtyn and Ivano-Frankivsk region

Local incentives:

  • Tax and customs benefits (according to the law on industrial parks)

  • Reduction or exemption from land tax

  • Benefits on real estate tax

  • State support (up to UAH 150 million per industrial park)

  • Co-financing program for networks and infrastructure

  • Water supply

    25.5 l/s (daily demand ~1000 m³);
    connection to artesian wells and city network. Treatment system and own stormwater drainage.

  • Natural gas supply

    Approx. 1963 m³/h. Construction of a gas distribution station planned (capacity 3000 m³/h).

  • Electricity supply

    3.19 MW/h (project connection to 35 kV power line, new 35/10 kV substation with 5 MW capacity and expansion potential).

Clusters:

Total area of the Industrial Park: 20,4535 га

  • Plot 1: 20.4535 ha
  • Industrial buildings – 84,800 m²
  • Warehouses – 11,520 m²
  • Administrative buildings – 8,445 m²
  • Technical facilities – 1,237 m²
  • Total planned construction area – over 99,000 m²
  • Expected annual taxes after reaching full capacity – UAH 168 million
  • Number of jobs – about 1000 by 2032

Specification

Planned activity schedule:

Stage 0 (Q1 2025) – Registration of the Industrial Park
Stage 1 (Q2 2025) – Selection of managing company
Stage 2 (Q3–Q4 2025) – Network and access arrangement
Stage 3 (2026–2027) – Construction of first production sites, attracting participants
Stage 4 (from 2028) – Full-scale operation

Yaroslav Zharikov

Client Relations Manager

    Contact us

    For detailed information on participation in industrial parks, as well as insights about the parks and land plots available for industrial parks

    Our Media

    Economy of Trust Ukraine Business Units

    All EoTU business units are stand alone legal entities designed, in aggregate, to provide comprehensive support for any transaction, from any source, in any amount to all stakeholders

    Our Business Development Ambassadors

    • Andrii Hnap

      Ukraine
    • Bruce Talley

      United States
    • Florian Andrews

      Germany
    • Gustavo Lopez Ghory

      Switzerland
    • Kateryna Volianska

      Netherlands
    • Olga Zmiivska Vasylkovska

      Ukraine
    • Zoran Jelic

      Croatia
    • Elena Kaijen

      Netherlands
    • Tomoko Hoshino

      Japan
    • Kristian Dryniak

      Poland
    • Ferran Donate

      Spain
    • Natalia Buriakovska

      Ukraine